Showing posts with label pump house. Show all posts
Showing posts with label pump house. Show all posts

Tuesday, November 26, 2013

Still Raining, Still Dreaming



 The girls made short work of the 3 broccoli plants I pulled up for them today.  Now that the cold weather has already descended upon us they really go bonkers for any greens.  We've had a few fairly cold nights so far but this whole week looks to be darn cold.  We are even expecting some snow tonight, or at least icy weather, so I spent a bit of today trying to cover the remaining broccoli in hopes that they will continue to grow to full size heads before I have to cut them.  I harvested 3 pretty good size ones ahead of this cold, pulled up a few spent ones for the chickens and am crossing my fingers I can eek out a few more heads from the rest.
  

All the fall crops are doing really well this year if I can just keep them from getting too icy.  Above you can see a few that need to get just a little bigger before I cut them.  However, push come to shove I'll cut them small just to keep from losing the whole thing.


One of the years I'm going to be organized enough to get these planted earlier and harvested before it gets this cold!  You know, I started some from seed but then bought most of these starts from the feed store just as soon as they put them out.  Seems like to me they would offer them sooner.  I don't know if it's the fact that most of these come from a company in south Alabama, and they are going by their growing schedule, or it has just been getting abnormally cold here for November these past couple of years and stores have not adjusted to that.  Well, either way I must get the hang of starting seeds myself and going by my own schedule.  I've got to get a better set-up for such things though.

 

I have also been working diligently on insulating the pump house.  I had a few sheets of 3" iso-board left over from the roof and it was just enough to insulate all of the pump house including the ceiling, which is where most heat loss occurs anyway.  This was waaaay overdue and I feel like a sorry slug for not having it done years ago.  Oh well.  Anyway, the pump house should be great now with this and considering that it is half underground also. I also installed some shelves so we could store some extra coolers and a few things.  I have also thought it might half work for a small root cellar but I'd have to look into that a bit more.

I know these posts lately have been fairly boring but not a lot going on still and I don't have the mental where-with-all to think up a post about much else.  All my recent tests have come back fine so I don't really know what's going to happen next.  I still feel like hammered crap.  I have been trying to kinda take notes and see what, if anything, makes me feel worse or better etc. and I have noticed that I generally feel really bad after I eat, especially if I eat much protein.  Like about an hour later I can barely function.  This is the same exact thing that happened to me after I got food poisoning several years ago and I can't help but think it is somehow related.  And, if I take ibuprofen, I will generally feel fairly good.  Or at least, not like crap.  Trouble is, I hate to take the nsaids because of what they can do to your kidneys.  Sort of a damned if you do or damned if you don't.  So, I'm trying to go easy on the proteins and see if I can get somewhat functional again.  I appreciate ya'll bearing with me and maybe I can get back to doing some actual work before too long.

Saturday, July 14, 2007

Southern Rain

We are still getting a good bit of rain every day it seems like down here. Plants are going nuts everywhere. The title of this post is a old Cowboy Junkies song. If I were smart enough I could put a link in so that you could hear part of the song but as it is, you'll just have to Google them if you want to. Great band though. The song starts out with the husband saying, "looks like a storm cloud coming, honey, guess we'll have to stay in bed today". It goes on about other stuff and then she ends the song saying you'll never catch her complaining about too much southern rain. I wouldn't either.
I don't think I have shown a picture of the exterior of the house in a while. Not much has changed there. All of the block that is going to be laid is there though. Charles came this past week and finished that up. This photo looks kind of messy though; I need to do a good clean-up. Lots is happening on the inside of the house though. I finished the ceiling, hallelujah!!!! We are going to be installing the slate floor in the bathroom on Sunday. More walls are primed and ready for finish paint.
The pump house is much further along but not quite finished. I still need to roof it and put a door on. At some point it will get a floor too. I am going to build 2 small retaining walls on either side of the trail leading up to the door also and backfill all that so most of the concrete you see here will be covered up. The pump and tank continue to work great in this location. It is better we moved all this down here as it turns out because this equipment is louder than we thought it would be and if it stayed under the house you would definitely be hearing all that.
Hopefully, the slate floor will go well tomorrow and I'll try to get some more inside photos up.


Wednesday, July 04, 2007

Dog Dish Cobbler

Okay, let me explain this one. As I have mentioned in a previous post, we live in a very small "apartment" right now and I only have a makeshift kitchen for now. Any baking has to be done in a toaster oven and even though it's a pretty good size toaster oven, most of my regular baking pans, dishes don't fit in it. Well, Allen was really wanting a blackberry cobbler since there are so many fresh blackberries for the picking right now. We eat very few sweets but I do sometimes make something for dessert, mainly for him. Since funds are very tight right now due to my being laid off, this was a good deal also because I didn't have to buy anything to do it. Anyway, I needed a good deep dish to bake it in, couldn't find any of my regular stuff that would fit, when I remembered that I had thrown several dog bowls and had never sold them. Hhhmm. Stoneware is perfect to bake in. This one was the perfect size. And no, they had never been used. So, I whipped up this cobbler and it came out just wonderful! Stoneware really cooks nice; everything really bakes very even. No overdone bottoms. In fact, when I start throwing again, I may start making a similar form just for cobblers etc.
We received a good bit of rain over the past weekend so the garden is really doing well. Last year I planted 2 lavender shrubs ( plants, whatever) and they are really taking off now. I think they liked the dry weather actually. I have already harvested several bundles like this one and they keep producing more. I have them all hanging in the apartment drying and they really smell great.
On house news, Allen has about finished the structure of the pumphouse; just need to put some kind of siding on it and finish roof. I have started painting in the bathroom and bedroom!! Once again, my boys came through and I received enough paint to start this next step. I have primed the bathroom, bedroom and clerestory wall and mixed the color I want for the bathroom. I'm still working on the color for the bedroom. I want to finish the bathroom first so the flooring can go down because that means the toilet is next!!! The tile for the shower is going to run me about $360.00 so unless I came work some deal there, installing that may be a while. Also, as soon as the clerestory wall is done (trim and everything) I can remove the scaffolding and frame the wall for the kitchen. There is still sooo much to do but actually starting some finish work is really picking my spirits up considerable.

Wednesday, June 27, 2007

Cool, Clear Water

I do not think I can quite express my overwhelming joy and glee at what you are now seeing. That beautiful, clear water is freely flowing from my garden hose whenever I turn the knob! True, it's not flowing in the house yet, but like the monkey said when he got his tail caught in the door, it won't be long now. Mostly due to Allen's great efforts, we finally relocated the pump and tank and got everything wired and hooked up. The pump house itself is not finished but is providing enough shelter for the equipment for now.
We had to run about 220 feet of #8 wire in conduit to this new location. We are using a 1hp shallow well pump which draws 7 or 8 amps running but more when it initially starts up. I found several different recommendations for wire size on this due to length of the pull etc. but #12 seemed to be the most popular size. I did want to go one size up from that because this allows for greater energy efficiency. Just like water flows freer through a larger pipe, electricity flows easier through larger wire. I read a couple of studies on how much cheaper it is to run an appliance or whatever if you go one size bigger on the wire. On average, it was about $30-$40 a year savings, which may not seem like that much but to me, that adds up. Actually, the #8 is 2 sizes bigger but Allen insisted and we worked out a deal where he gets my leftover #12 wire (which I had procured at an earlier date for free), which will be a lot, in exchange for this wire here. The electrical box is an old leftover off a job, the rafters are 80 year old heart pine out of an old building downtown and the roof decking is plyform from way back when we poured the first foundation wall for the house. We did buy the PT 2x4's for the framing.

Here you can see the configuration of the pump and tank and how that is all hooked up. There will be a real floor in the house at some point. It did not take anywhere near the effort to prime the system this time. Of course, the water line was still holding water from our first efforts but it was much easier to get going and you can hear that it just runs better and sounds better. There is only one 90 degree turn in the pipe on the suction side.


Here you can see that, in order to keep the water lines as even and in line as possible, the equipment was located at different elevations. I was pleased to see the concrete walls came out as well as they did. I was afraid that with such tight (4") forms and no vibrator, we were going to have a bunch of honeycomb in the walls but we didn't. I bumped them really good but gently with a sledgehammer the whole time we were pouring. If you look close you can see the little PT blocks we embedded in the top of the walls for the framing to fasten to. That seemed to work well. Pulling wire that far was really a pain. We ran a strong string through the conduit as we were gluing it together but when we tried to pull all three wires through, the string broke. So, we pulled everything back out and sucked the string back through with a vacuum. We then pulled just the ground wire through (we had double length of it) and used it to pull the 2 hot wires and another length of ground wire. That worked pretty good but you still need one person at each end pushing and pulling.

So now I can water my garden just standing there instead of hauling water in buckets up from the creek. I watered everything I could reach today, even myself some. That spring water is COLD though! After about an hour of running water and making sure the pump and tank were going to work properly, I checked the spring level. It had dropped about 12-14 inches, which did cause me some concern. I have not seen it drop that much that fast. Anyway, I turned the water off and left for about 2 hours and when I came back the spring had completely recovered to it's previous level.

Monday, June 18, 2007

Late In The Evening

Over the weekend we formed and poured the lower walls for the pump house. The tallest part of these walls are 3'-6" and then we will frame the rest of the structure on top of this. The walls are 3 5/8" thick so that the concrete and the wood frame will all be one thickness. Not that that really matters but it helps cut down on the amount of Quickrete I had to buy and mix etc. and it is sufficient to hold. We used concrete for the bottom half to be able to backfill against it and offer some thermal protection to the pump and tank without running a heater. Also, if we had wanted to do the whole thing wood-framed that would have required A LOT of excavation and the dirt in this area is very hard. As you can see if this photo, we went ahead and made the door frame out of PT 4x4's and set it in concrete. This way it served to help form the front walls and tie into the concrete.
Allen made up the rebar mats for the walls while I cut the plyform etc. We did not pour any footings and will pour a little dirt/mortar floor later. Due to the thinness of the walls and the hardness of the dirt I think this will be OK. Normally, I would always pour some kind of footing but, as we say on the big jobs, we ain't building no piano. The 2 holes in the ground are for the door frame.

This is a detail of the of the forms; I didn't think this was a very good shot but maybe it's clear enough to see what we did. The forms are basically 3/4" plyform (not regular plywood although that would be fine) with 2x4's nailed on the edges to stiffen. Plyform is plywood (usually fir) that has been treated with an oily release agent. It has a good smooth surface kinda like BC and is great for sheathing later because it resists moisture. We did not use snap ties because, as far as I know, they don't make 4" ties but these walls were not hardly big enough for them anyway. The little, wooden block in the photo acted as a snap tie in that it kept the forms a certain distance apart and, being PT also, will be left in the walls to screw the wood framing down to. We ran galvanized screws halfway into the sides of the blocks to help them bond into the concrete. There are also 2- 3" PVC sleeves down in there to form a passageway for the water pipe and electrical conduit to run through the walls.

This is just me floating off the top of the walls trying to get them pretty much on grade and fairly smooth so the bottom plate of the wood framing will sit nice. The interior forms we set at grade but for ease we just let the outer forms run wild on about half of it. We couldn't do a lot of digging or disturbing ground without it falling into the wall forms.

We started mixing and pouring about 3:00 p.m. and finished around 7:00. We used 28, 80 lb. bags, so we poured 2,240 lbs of concrete ( doesn't include the water) with a 5 -gallon bucket. We took turns mixing but we were wore slap out by evening to say the least. If you are wondering why didn't I just order concrete, well, I'll tell you. Even all that wouldn't have made quite a yard of concrete. All the batch plants up here charge a 3-4 yard minimum and with concrete going up to $91.00/yard min. it was much cheaper this way. Plus, we would have had a major time getting a truck up in the woods where this thing is, if it would have been possible at all. Now, we could have laid 8" block and it would have been cheaper (maybe not much) and easier ( sorta) but we just prefer poured concrete. Maybe we are gluttons for punishment. Oh, BTW, the local building supply once again beat Lowe's and Home Depot on prices. They were about 50 cents cheaper per bag on the Quikcrete than the big box stores. How is that possible? Hhhmm. Something stinks in Denmark.