Showing posts with label insulation. Show all posts
Showing posts with label insulation. Show all posts

Tuesday, November 26, 2013

Still Raining, Still Dreaming



 The girls made short work of the 3 broccoli plants I pulled up for them today.  Now that the cold weather has already descended upon us they really go bonkers for any greens.  We've had a few fairly cold nights so far but this whole week looks to be darn cold.  We are even expecting some snow tonight, or at least icy weather, so I spent a bit of today trying to cover the remaining broccoli in hopes that they will continue to grow to full size heads before I have to cut them.  I harvested 3 pretty good size ones ahead of this cold, pulled up a few spent ones for the chickens and am crossing my fingers I can eek out a few more heads from the rest.
  

All the fall crops are doing really well this year if I can just keep them from getting too icy.  Above you can see a few that need to get just a little bigger before I cut them.  However, push come to shove I'll cut them small just to keep from losing the whole thing.


One of the years I'm going to be organized enough to get these planted earlier and harvested before it gets this cold!  You know, I started some from seed but then bought most of these starts from the feed store just as soon as they put them out.  Seems like to me they would offer them sooner.  I don't know if it's the fact that most of these come from a company in south Alabama, and they are going by their growing schedule, or it has just been getting abnormally cold here for November these past couple of years and stores have not adjusted to that.  Well, either way I must get the hang of starting seeds myself and going by my own schedule.  I've got to get a better set-up for such things though.

 

I have also been working diligently on insulating the pump house.  I had a few sheets of 3" iso-board left over from the roof and it was just enough to insulate all of the pump house including the ceiling, which is where most heat loss occurs anyway.  This was waaaay overdue and I feel like a sorry slug for not having it done years ago.  Oh well.  Anyway, the pump house should be great now with this and considering that it is half underground also. I also installed some shelves so we could store some extra coolers and a few things.  I have also thought it might half work for a small root cellar but I'd have to look into that a bit more.

I know these posts lately have been fairly boring but not a lot going on still and I don't have the mental where-with-all to think up a post about much else.  All my recent tests have come back fine so I don't really know what's going to happen next.  I still feel like hammered crap.  I have been trying to kinda take notes and see what, if anything, makes me feel worse or better etc. and I have noticed that I generally feel really bad after I eat, especially if I eat much protein.  Like about an hour later I can barely function.  This is the same exact thing that happened to me after I got food poisoning several years ago and I can't help but think it is somehow related.  And, if I take ibuprofen, I will generally feel fairly good.  Or at least, not like crap.  Trouble is, I hate to take the nsaids because of what they can do to your kidneys.  Sort of a damned if you do or damned if you don't.  So, I'm trying to go easy on the proteins and see if I can get somewhat functional again.  I appreciate ya'll bearing with me and maybe I can get back to doing some actual work before too long.

Wednesday, November 07, 2007

I Should Have Known

OK, so maybe I'm not such a lucky so and so after all. On Sunday I worked all day trying to get the last of the shower tile installed so that I could possibly grout it during the week. Allen got the plumbing hooked up and ready. The trim pieces on the faucet etc. can't be installed until the tile is grouted but the valves and all are there. So, I get down to the last pieces and realize that I am short 6 pieces of bullnose tile for the edges. I am also short about one full sheet of the the regular flat tile to do the curb there. Which means more than likely, I will have to buy a whole new box just to get that one sheet. That's what I get for being a smarty pants and for not figuring that tile down to the last few inches. I just figured a rough dimension. And I'm not sure when I can get back to the tile company to order more.
Well, we had our first actual freeze here last night and of course, I had waited until the last minute to do anything to protect the pipes coming out of the spring, the ones in the pump house etc. But I ran home from work as quick as I could and got busy insulating and covering and boarding up and everything seems to have come through OK. One major project for this coming weekend is going to be building doors for the pump house and under the house though. Also, the the spring is going to have to be closed up better than what I have on it now. I just wrapped the pipes as best as I could with insulation and threw a thick tarp over the opening of the spring. Then I mulched heavily over that and placed rocks all around the edges to hold in the warmth from the earth. I think I will lay up a stone wall ( much like a well would have) and then cap it off with a little insulated roof of some kind.
The next major thing now is to get heat on in the house. Allen and I discussed where to put the propane tank this afternoon and he is going to go during the day tomorrow and see about getting that going. I have talked to the plumbers at work about the size and type of gas lines to run and have gotten that pretty much decided, so now it's just doing it. And having the money for it.

Tuesday, September 04, 2007

Back On The Inside

With a little money back in my pocket I was able to afford to buy some material for the house since I need to start concentrating more on completing items that will get me moved into the house. So, I opted to get this wall at least closed up and partially finished. This is insulation that, as you might recall, I salvaged off a job last summer. All of the space above that horizontal top plate (2x4) is next to my attic and needed insulating against heat and cold. All the space below that (the actual wall area) I thought I would insulate against sound since I had the leftover insulation. I don't like the idea of standing in the kitchen and hearing the shower run or the toilet flush so maybe this will help. Also, it insulates the bedroom wall which may help some if someone is in there trying to sleep and someone else is up moving around.
We then completely sheathed the wall in 1/2" CDX. Let me stress, this is not finish! This wall will be covered once more in a thin but very nice grade plywood and stained. This finish layer will be run in a very defined, 4'x4' grid pattern so it was either place studs within the wall everywhere the edges of the finish plywood would fall or just put this under layer of plywood up and I could fasten over it anywhere. I think this was less trouble. Also, due to expense, it may be a while before I can afford the finish plywood and this allows me to close the wall up now. There is lots of plywood now everywhere and I'm not liking that much but I just keep telling myself most all of it will eventually cover up.
We also installed the smoke detectors; this is one in the bedroom with it's little shower cap on. You keep those on until construction is completely finished because dust can set these things off and it is really irritating. On the commercial jobs I work on they NEVER have these little covers and the detectors are forever going off until they allow us to tape plastic over them. We also finished filling in all of the water line trench. YEA!
I am having some issues with the house now that it is getting closer to the point that I could actually move in. The recent rains have resulted in a lot of runoff into the spring and really fouled the water system. I think part of this was my own fault for not having the water line trench filled in; the water ran straight to the spring. So, I must put up a silt fence in the next day or two for an immediate fix and then start work on a masonry wall of some sort around the spring to protect against future runoff. The problems with the water system are really bothering me. I have running water but half of the time I can't drink it. I have got to get all of this sorted out soon. How I am going to heat this winter is an issue also and something that must be resolved in the not so distant future. If I can just get the shower functioning, the porch built and the scaffolding out of the living room, I would be happier and I could actually move in. Sometimes it all seems so monumental and I only seem to be making baby steps. Of course, that's better than none at all, I guess.

Wednesday, February 21, 2007

Rock and Roll (Hootchie Coo)

Well, we rocked some; not near what I'd like but it's a start. When the entire house is built this will be the guest bedroom but it will be the main (only) one for now. The master bedroom and one more will be in the other section across the dogtrot. There is not alot of drywall in the house actually since the living room/kitchen ceilings don't hang and some of the living room walls get plywood. We could finish it ourselves but I am going to get a price from a buddy of ours for him to mud and finish it. It's worth paying a reasonable price to me just to get it done. Allen is good at sheetrock work but we are both slow at it and things are going slow enough as it is. We also ran some sheetrock in the bathroom but had to leave a bunch open for plumbing.
This is the first of the actual plumbing!! You have no idea how happy I will be to finally be able to......... not go somewhere else for things. I finally decided where to put the toilet too! That actually was one of my harder decisions to make. We will be working on plumbing this weekend because it looks like we are in for some more rain. Hopefully I will get my perk test done within a week to start the septic system. That's $500.00 for someone to come out and dig 4 or 5 holes in the ground and fill them with water! I know, there is more to it than that but I am down to counting pennies at this point. As soon as we get that done I can go buy my septic tank permit and start putting that in. This is the one thing that I have to have inspected and if you don't get it inspected and passed the power company will not put in your permanent power. They are in cahoots with the city and health department.
A note on the insulation and plumbing: that is R-11 unfaced fiberglass insulation in the walls. It is standard stuff they use in commercial applications. As I have stated before, I would have liked to have used some of the natural cellulose or cotton insulation they have but this stuff was free so... there you go. At least no energy will have to be used to make my insulation because I'm recycling and this stuff will not go into the landfills. We are using PVC on the drains and vents in the house but everything else will be copper. Copper is through the roof right now and has been for some time. Lots of copper thefts on construction sites too. We are also starting the plan for the solar hot water system. This will be the only active solar part of the house for right now. I did not realize that there are so many types of solar water systems: indirect, direct, roof top collectors, ground level collectors etc. etc. Do any of you have any experience with such things and/or have any advice?

Monday, February 19, 2007

Stuff Like That There

This weekend was spent stuffing stuff. It was too cold and windy for roof work so we bought some sheetrock and worked on the inside. If you remember, I already had this insulation from a demo job and it's lasting pretty good. I was afraid it wasn't going to go very far but I still have about 6 more bags after doing the bedroom and bath. We got all of the bedroom here done and completely sheetrocked and all of the bathroom insulated except for what we needed left out to do plumbing.
I love that foamy spray stuff! I sealed around all the windows and door and behind each plug and switch box. If you use it around windows and doors though, you need to make sure and get the type made for that application which does not expand so much. The regular type will bow your jambs and you don't want that! This was Allen's idea on the boxes actually. It's hard to get the roll insulation behind each box and you really don't want to tear your strips up so we thought this would work good. Some people use it to seal around plumbing penetrations in the floor too etc. but I prefer to Bondo stuff like that. I don't want foamy stuff in my floor. I know; I'm weird. I also got on Allen's nerves because I went around behind him making sure all the insulation strips in the walls were all turned the same way. He says there is no front or back but I say there is!

Now, I do like to use the foamy stuff to seal around the wiring penetrations in the walls. However, in my foaming fervor I forgot that the wire needed to actually be in the hole before you foam it shut. I had to dig this out for my phone lines to come in.


I also thought it would be great to use the foamy stuff in the T-posts. This is where the interior walls join the exterior walls at a right angle. These areas are basically hollow and I want them filled up! No hollow spaces for air to come in! Stupid, bad idea! It all falls to the bottom and then slowly oozes out the crack at the bottom for 24 hours. We worked until about 9:00 p.m. Sat. night which was great because I have heat and light!! It's temporary heat but it works.
I got another hit from Pella Corp. today....maybe they are not going to gang up on me. I don't care: put up your dukes Pella!! Heeyaa!! Fat, nasty corporation!




Monday, February 05, 2007

A Hard Day's Night

Progress on the roof is coming along slowly but surely, I guess. We got all but one piece on the front half of the house this weekend. This is the worst side due to the fact that over half of the pieces are 27 feet long. We were afraid the weather was going to be too bad to do roofing but it turned out okay after all.
It has been fairly cold here (for us) lately as we have been averaging in the 40's during the day and the 20's at night. Usually we are in the 50's during this part of the year. Pablo had asked awhile back about how our winters are and sometimes they can be pretty cold. The past 3 years, I would say, have been very mild winters but this year has been making up for that. I remember my first winter as a little apprentice carpenter. I was working on a 6 story building, pouring concrete columns and floors. You just go straight up with that part and then much further below they start putting up walls, so if you are on the sixth floor, there is nothing between you and the wind but a barbed wire fence as the old guys used to say. Anyway, it gets cold up there and I remember one day I looked around and all the guys with mustaches had icicles hanging down out of them. I thought to myself', "what the hell am I doing out here?" But, the desire to eat and have a dry place to sleep will keep you going sometimes.
But back to the original story... we had a bit of a time getting these long pieces up on the roof. We finally devised a little ramp on the back of the house, where the ground is higher, and would walk the end of one up and prop it on the roof. I would push the piece up as far as it would go while Allen ran around to the front of the house and up the ladders etc. and then over the roof and grab the piece and pull it up. Then, I would run around and up the ladders etc. and get on the other side and we would carry it over to where it was to be installed.
Since we have lights and heat (YEA!!) we can work after dark so when the sun went down we insulated the attic. It's only about 300 sq. ft. but that took a little over 5 rolls of insulation. It went down pretty quick and easy. The boards you see laying around over the joists are all the patterns for rafter tails and such. We made sure to save anything like this so that when the other half of the house is built, everything will match. I was using them to kneel on while stuffing the insulation. I always have a fear of falling through the sheetrock in attics. I will probably put a little plywood down up here for a little storage space but not much. If you have space like this you will fill it up and usually with junk so I limit myself in some areas. FYI, this insulation is the standard R-25, 8" deep. Some green builders advocate the use of the foil lining on the rafters but I'm not really convinced that stuff works. Does anybody out there have any experience or proof that it helps?

Sunday, October 15, 2006

Up On The Roof (again)

Here is a little bit of a differnet view of the house that I don't think I've shown before. I like this because you can see all the way thru the house. We finished insulating the entire roof now and are ready to order the metal decking. I will be glad when the roof is done; the rest of the work moves faster. Pablo had some interesting questions about my last post and since I did not get to answer him when he first left the comments, I thought I would just answer now because some other people might have been wondering some of the same stuff.
As far as how much we are insulating; Alabama winters can and do get fairly cold. I think our average daytime temperature in Dec., Jan. Feb. is low 50's but quite often in the 40's and nights regularly go 30's but can get down in the teens. I remember one Christmas Eve night when I was a teenager it was 7 degrees. But here is the thing; your primary source of heat loss from inside your house is through the roof. There is some through windows and walls etc. but hot air rises and so it transfers itself out that way. It's not to keep the cold out so much as to keep your heating source from having to work so much by retaining as much heat as possible. However, in the summer, good roofing insulation does work by keeping heat out because of heat transfer. The roofing will heat up and in turn heat the decking, then the attic, then your ceiling etc. until it migrates into your living space. Good insulation and air spaces help prevent this. As do light colored roofs. Basically, insulate as much as you can possibly afford to.
Now, on the bullseyes on the roofing membrane; you would not normally use that membrane the way we did (which you may know). It would normally be put down directly on the plywood decking, under the shingles or whatever and when you nail down felt or this stuff, you are using short felt caps and it doesn't matter if you hit rafters or not because its in the attic. Now, this does bring up something I failed to mention. We don't have any attic in the living room/ kitchen area of the house, so what are we doing about that? When we nailed down the sleepers (the 2x4's that are sandwiching the insulation panels) we did take care to hit the rafters so that no nails would show on the ceiling. The insulation panels are not nailed but they do have metal clips on top of the sleepers holding them down. The fancy roofing membrane is nailed to the sleepers and glued also so we don't have to worry about nails showing from that. I hope I am able to explain this correctly, if not please ask more.

Tuesday, October 10, 2006

Upside Down/ Inside Out

We started on the roof insulation this weekend. We are using a 3" thick foam board called Iso board. It's similar to the Dow blue board that you may have seen in Lowe's or Home Depot but it has a 18.5 R- value where the Dow board is R-15 and it was only about $1.25 a sheet more. That's a 4' x 8' sheet. It has about 45% recycled content too, so I was happy about that. It is normally used for commercial structures but is great for this application. The gable end of the house (where there is attic) will also have traditional bat insulation so that end will be really well insulated.
We ran two 2x4's all around the perimeter of the roof and then started laying down one run of Iso board all the way across the roof and then sandwiched that with 2x4's. Then just keep repeating until you reach the top. The only thing about the Iso board is it has alot of fiberglass in the outer paper coating so I was SO itchy at the end of the day.
After we ran all the insulation we went over that with this high tech new roofing felt stuff I got for free off of a job. It's not really felt; it's more like a vinyl type stuff. It's great to work with though. It lays down very nice. We put this down because we are going to have a metal roof and you usually get some condensation under a metal deck and this material will protect the framing and insulation from getting damp. Plus, it didn't cost me anything so, what the heck!
In putting all this down it meant we had to take up our toe-boards from the roof and therefore nothing to catch on if you start sliding. The roof is not really steep but Allen was afraid this material might be slick and he knows how clumsy I am, so I got to wear that wonderfully attractive harness.
This is just a close up of the "felt" we used. Cool stuff and it's treated somehow to be non- skidding to walk on. It also comes in 4' wide rolls whereas traditional roofing felt comes in 3' wide rolls. I thought it was funny how they put little bullseyes everywhere you are supposed to nail it too. And no, we didn't nail it everywhere they said as you can probably see.